The Diesel Tank Station Extension Project “Phase-III Fuel Station” located at the southeast and northeast of the existing Diesel Tank Station “Phase-II Fuel Station’’, which is about 1000m southeast of the Buzurgan Terminal, about 100m to the National Road.
SWCO responsibility is detailed survey and engineering (shop drawings), supply of equipment, materials, construction, installation, testing and commissioning, adjustment tools & facilities; detection for identify all underground facilities, and carry out all the grading & leveling of the site, manufacture & fabrication, build & erection, construction, installation, decoration & finishing, supply of structures, constructions, petroleum, mechanical, electrical equipment & systems, outdoor site works and utility system on all disciplines & specialties.
SWCO effectively implement the quality system defined in the plan, verify execution of the implemented system and issued reports of audits performed. Any non-conformance handled in line with the requirements of the Quality Plan.
SWCO provided all quality control during all construction site activities including but not limited to survey, site development, and Construction, reinstatement and documentation phases of the Project to confirm the work has been completed in accordance with the Contract and Quality Plan requirements.
Also provided a team of experienced and formally qualified Quality Control (QC) personnel to cover all aspects of the work.
As part of the Construction activities SWCO undertake all inspection and testing activities necessary to prove and validate the correct and complete execution of the work. Inspection and testing performed in accordance with the agreed Inspection and Test Plans (ITP’s)