The scope of work performed by the SWCO includes but is not limited to survey, detailed engineering, material procurement, construction, security and project management of flow line phase I facilities. The detailed work includes but not limited to well pad pre-bury work, newly drilled flow line, old well flow line replacement, well head manifold, new manifold or manifold extension, electrical, instrumental, telecommunication system, process upgrade of casing pressure control for a single well, ICCP system for pipelines, civil, structure, and other accessories.
The Scope of Work includes but is not limited to the followings:
Oil gathering process system covering above-ground piping and instrumentation.
Within the scope defined in the technical package
Underground crude oil transmission pipelines
Solar Power System or UPS system
Electrical System
Instrumentation and Control System including Well Head Control Panels