Sulfur Warehouse

Sulfur Warehouse

SCOPE OF WORK

The Sulfur Warehouse Project will be inside the Buzurgan Oilfield, which is beside the road between Buzurgan North Checkpoint and Burzurgan North Degassing Station. Land area is about 75,000 square meters and is enclosed with anti-blast concrete wall. SWCO is the responsible for the detailed survey and engineering (shop drawings), supply of equipment, materials, construction, installation, testing, adjustment tools & facilities, grading & leveling of the site, manufacture & fabrication, building & erection, construction, installation, decoration & finishing, supply of furniture, the work shall cover up on all required disciplines & specialties. In conjunction with approved engineering drawings, technical specifications, conditions of contract, and all the related ITT documents, and international industrial practice to reach the satisfaction, approval, and acceptance by Company.

COMBINING FEED DOCUMENTS AND DRAWINGS, TECHNICAL SPECIFICATIONS

THE MAIN SCOPE OF WORK OF SULFUR WAREHOUSE INCLUDES BUT NOT LIMITED TO THE FOLLOWING ITEMS:

  • SITE SURVEY, SOIL INVESTIGATION AND DETAILED ENGINEERING WORKS

  • SITE WORKS & OUTDOOR WORKS

  • MAIN BUILDING WORKS

  • SULFUR WAREHOUSES

  • GATE HOUSE

  • OPF GUARD HOUSE

  • SUBSTATION & SWITCHGEARS SYSTEM

  • OUTDOOR ELECTRICAL SYSTEMS

  • ELECTRIC POWER SUPPLY SYSTEM ERECTION AND TIE-IN WORK BETWEEN EXISTING BUN 33KV OHTL AND SULFUR WAREHOUSE SUBSTATION

  • DIESEL GENERATOR SYSTEM

  • OTHER OUTDOOR ELECTRICAL WORKS

  • OUTDOOR TELECOMMUNICATION WORKS

  • OUTDOOR WATER SUPPLY & DRAINAGE SYSTEM

  • FIRE WATER TANKS

  • FIRE WATER PUMP STATION

  • VISUAL COMMUNICATION SYSTEM

  • CATHODIC PROTECTION (CP) AND ANTI-CORROSION

  • HAZARDOUS AREA CLASSIFICATION

  • TIE-IN WORKS